The network infrastructure built to meet a user’s requirements depends on several factors such as the location, applications to be used, budget, and even the number of users. Oftentimes, these factors call for specific equipment to be deployed. In one instance, a Peplink partner’s client chose to hold their annual meeting at St George’s Hall in Liverpool and required a reliable internet network. 

Challenge

While the old English building had an existing network, the meeting was expected to have 1000 guests in attendance. The client had previously experienced connectivity issues and required an enhanced network to ensure all devices would have access to sufficient bandwidth and speeds.

The old English building and the large number of users presented several challenges. There was limited space and power availability for equipment installation. Additionally, the Peplink partner had to work within a set budget to ensure a network solution that would operate without a single point of failure. These constraints eliminated the possibility of conveniently adding more units to alleviate congestion and meet the increased demand.

Solution

Designed to handle high network traffic, an EPX was installed as the core of the solution in the old English building. Dual BR2 Pros were then added for cellular connectivity. The EPX provided the Peplink partner with the flexibility to connect a 1GB fiber line while utilizing cellular services. Diverse routes were established for fiber optic cables to provide redundancy should a pathway or system unexpectedly fail.

Several 24-port SD Switches were connected to the EPX at St George’s Hall, with up to 20 AP One AXs attached and placed along each side of the building. This placement ensured there was no dead zone in the main room where the meeting was to take place, as well as create independent systems. To monitor the network, the Peplink partner set up battery-powered Transit Duo Pros and enabled InControl’s Air Monitor feature.

Result

The configuration provided the Peplink partner with the means to monitor the network in the old English building, providing reports on the connectivity at key locations. The fiber connection offered guests with ample high-speed connectivity, while the cellular connections were on standby for backup.

During the event, one of the physical cables was accidentally damaged, breaking one of the lines of access points. However, with the independent systems in place, the overall Wi-Fi connectivity remained uninterrupted throughout the meeting.

Deployment

epx

EPX

  • Deployed in the old English building
  • Equipped with fiber connectivity
  • Designed to support thousands of users
br2 pro

BR2 Pro

  • Connected to the EPX
  • Adds cellular connectivity option
  • PoE Input for powering the device

SD Switch 24-Port Rugged

  • Bridges EPX and AP One AXs
  • Up to 24 connected devices
  • Enables connection to wired peripherals

AP One AX

  • Installed at each side of the old English building
  • Set up in independent systems
  • Enables Wi-Fi 6 access to guests

Transit Duo Pro

  • Placed in key locations of the network
  • Battery-powered for quick deployment
  • Used to monitor network performance